Boiler Certification

NEED HELP WITH CERTIFICATION?

Required field
1/

The EAC marking confirms that boilers comply with the safety requirements of the Eurasian Economic Union (EAEU). Without the appropriate documentation (certificate, declaration, or other permit), the release of such products into circulation is prohibited. The type of document depends on the design, operating principle, parameters (voltage, pressure, power), and the HS code . This article covers key aspects of boiler certification according to the CU TR: current regulations, popular positions, stages, deadlines, procedures, and a list of documents.

Regulatory and ‑legislative framework

Boilers are subject to several technical regulations of the TR CU, depending on the type of equipment:

The choice of regulation and form of confirmation of conformity (certificate/declaration) is determined by the product parameters and the HS code.

List of products

Examples of popular boiler positions subject to regulation:

  1. Electric storage water heaters (boilers) with a capacity of 30–100 liters for domestic use.
  2. Instantaneous electric water heaters for apartments and private houses.
  3. Indirect heating boilers (with heat exchanger) for hot water supply systems.
  4. Combined boilers (with heating element and heat exchanger).
  5. Industrial storage water heaters of large capacity (from 200 l and above).
  6. Electric boilers with electronic control and Wi- ‑Fi modules.
  7. Stainless steel boilers for facilities with increased hygiene requirements.
  8. Boilers operating under excess pressure for boiler rooms and process needs.
  9. Gas storage water heaters (if classified as pressure equipment).
  10. Boilers as part of modular heating units and engineering units.

For each item, the document type and assessment scheme are determined based on a set of parameters and the HS code: for example, a household electric boiler most often falls under TR CU 004/2011 and TR CU 020/2011, while a pressure boiler also falls under TR CU 032/2013.

Procedure and terms of registration

The main stages of conformity assessment:

  1. Product identification and HS code determination. This is a key step: the code and technical characteristics determine the set of regulations and document format.
  2. Selecting the assessment form and scheme. For boilers, a declaration or certificate is most often used, using different schemes depending on the risks and product type.
  3. Preparation of technical documentation. Includes description, technical specifications, drawings, diagrams, operating manual, and safety justification.
  4. Sample testing in an accredited laboratory. Electrical safety, electromagnetic compatibility, tightness, strength, operation of protective devices, and other parameters are checked, depending on regulations.
  5. Documentary verification and registration. The declaration is registered by the applicant; the certificate is issued by the certification body after analyzing the evidence and (if necessary) auditing the production facility.
  6. Registration of information in registers and marking. After registration, the document becomes publicly available, and the product is marked with the EAC mark.

Estimated timeframe:

  • EAC declaration: 7–14 working days upon availability of a complete set of documents and ready test reports.
  • EAC Certificate: 2–4 weeks, including testing and (if necessary) production inspection.
    This period may be extended if additional testing is required, complex classifications are required, or if processing is carried out under multiple regulations simultaneously.

When is a certificate issued and when is a declaration or other document issued?

The document type depends on:

  • specific regulations applicable to the product;
  • risk categories and product parameters (voltage, pressure, purpose);
  • HS code and position in the lists of regulations.

As a rule:

  • EAC certificates are issued for products with higher risks or when the regulation directly provides for certification (for example, certain cases under TR CU 032/2013).
  • EAC declarations are used for most household electric boilers according to the TR CU 004/2011 and TR CU 020/2011 standards.
    A precise selection is only possible after identifying the product by its HS code and comparing it with the lists of regulations and requirements for pressure equipment.

Possible certification and conformity assessment schemes

The most commonly used schemes are:

  • For declarations: 1d, 2d, 3d, 4d – depending on the type of production (series, batch, single item) and the availability of in-house evidence. For boilers, testing schemes involving testing in an accredited laboratory (e.g., 3d) are often used.
  • For certificates: 1c, 3c, 4c – for a series, batch, or individual product; schemes may include testing, production status analysis, and inspection control.

The scheme influences the list of documents, the scope of tests, the validity period of the document and the frequency of control.

List of documents

Minimum set to start the procedure:

  • application and description of the product (type, purpose, main parameters: voltage, power, pressure, volume);
  • technical specifications (TU) or manufacturer’s specifications, drawings and diagrams;
  • test reports (if any) for electrical safety, EMC, tightness and strength;
  • documents on the quality and production system (for serial schemes);
  • accompanying documents (contract, invoice, specification) – upon import;
  • HS code and classification rationale;
  • operating manual, product passport, safety justification (for pressure equipment);
  • marking layout (to check compliance with regulatory requirements).

Depending on the scheme and regulations, additional materials may be requested (e.g., internal quality control results, component certificates, durability and corrosion resistance test data).

Conclusion

Boiler certification according to the Customs Union’s Technical Regulations (TR CU) is a systematic process that often requires simultaneous consideration of several regulations: low-voltage equipment, electromagnetic compatibility, and pressure equipment. The document type (declaration, certificate, etc.), procedure, and timeframe directly depend on the product’s parameters and its HS code. Due to ‑numerous nuances, independent classification often leads to errors, refusals, and delays.

To verify and accurately evaluate your product range, contact the experts at MASTCERT: they will help you determine current regulations, select the optimal scheme, prepare documents, and calculate deadlines.

HAVE A PROJECT?
I am interested in discussing a certification procedure for my product My name is and you can email me at

By clicking Submit, you agree to Fresh Consulting’s Privacy Policy.

COMPANIES WHICH TRUST MASTCERT